What this one covers
- 1
The stack. Turf isn't one material, it's six: $1.76 a foot under the turf that's probably never been quoted.
- 2
What a real crew does with it, and for once the number is good news: 45%, with room in the price.
- 3
Why a 250-foot job can be worth less than a 200-foot one, and the two things on turf no sheet can price: dye lot and direction.
The sheets
Prices are mine. Yours are different. The math is the same.
Ledge is software for landscape design-build. These sheets are the thinking underneath it.
Every number on these sheets is the kind Ledge carries for you on a real job: the burdened hour, the man-hours a price buys, what the crew actually did against it. The first ten shops run Ledge free; we make money only on payments. If you want to see it on your own jobs, there's one person to talk to.